Schools

&

ChildCare

Please Note These Images Are NOT Owned By NCPT, But All Post-Tension Work Was Completed By NCPT

Sunshine Coast Grammar School

At Sunshine Coast Grammar School NCPT Supplied and Installed the Post-Tensioning for the stadium surrounding the Swimming Pool, Completed in 2020

Tonnage: 3.2 ton

Pimpama State School

Pimpama State School was a Supply and Install of Post-Tensioning, Completed in 2020

Tonnage: 6.8 ton

Villanova College

NCPT completed this package as a Design and Construct of Post-Tensioning and Steel Fixing, Completed in 2020

PT Tonnage: 14.5

Steel Fixing Tonnage: 264.5 ton

Habitat, Nundah

Habitat was a Supply and Install of Post-Tensioning, Completed in 2019

Tonnage: 17.4 ton

Hymba Yumba

Hymba Yumba is an Indigenous Childcare Centre Supplied and Installed with Post-Tensioning, Completed in 2020

Tonnage: 5.9 ton

Ripley Valley Schools

NCPT Designed and Constructed both the Post-Tensioning and the Steel Fixing in both the Primary and Secondary buildings throughout this new School, Completed in 2019

PT Tonnage: 45.9 ton

Steel Fixing Tonnage: 212.3 ton

Carmel College

NCPT Supplied and Installed the Post-Tensioning for the Tennis Courts, completed in 2017 along with Block H completed in 2019

Tonnage Block H: 4.3 ton

Armidale Secondary College

NCPT Designed and Constructed both the Post-Tensioning and the Steel Fixing, Completed in 2019

PT Tonnage: 28.4 ton

Steel Fixing Tonnage: 109.9

© Copyright North Coast Post-Tensioning Pty Ltd