







Please Note These Images Are NOT Owned By NCPT, But All Post-Tension Work Was Completed By NCPT

At Sunshine Coast Grammar School NCPT Supplied and Installed the Post-Tensioning for the stadium surrounding the Swimming Pool, Completed in 2020
Tonnage: 3.2 ton
Pimpama State School was a Supply and Install of Post-Tensioning, Completed in 2020
Tonnage: 6.8 ton


NCPT completed this package as a Design and Construct of Post-Tensioning and Steel Fixing, Completed in 2020
PT Tonnage: 14.5
Steel Fixing Tonnage: 264.5 ton
Habitat was a Supply and Install of Post-Tensioning, Completed in 2019
Tonnage: 17.4 ton


Hymba Yumba is an Indigenous Childcare Centre Supplied and Installed with Post-Tensioning, Completed in 2020
Tonnage: 5.9 ton
NCPT Designed and Constructed both the Post-Tensioning and the Steel Fixing in both the Primary and Secondary buildings throughout this new School, Completed in 2019
PT Tonnage: 45.9 ton
Steel Fixing Tonnage: 212.3 ton


NCPT Supplied and Installed the Post-Tensioning for the Tennis Courts, completed in 2017 along with Block H completed in 2019
Tonnage Block H: 4.3 ton
NCPT Designed and Constructed both the Post-Tensioning and the Steel Fixing, Completed in 2019
PT Tonnage: 28.4 ton
Steel Fixing Tonnage: 109.9

© Copyright North Coast Post-Tensioning Pty Ltd